Borehole drilling

We undertake the entire process of borehole drilling, from ensuring hydrological and geological survey by qualified and registered hydrologist, acquiring relevant permit from water resource management authority, Conducting Environment Impact Assessment (EIA) & getting License from NEMA and Getting No Objection Letter from Water Service Provider or local government authority mandated to preside over water resource.

  • Actual Drilling Process : 
  1. Drilling of 11”until loose top formation & installing 9” temporary casing then   drilling 8” up to recommended depth.
  2. Casing: Installation of 6” Casing pipe – Class – B up to bottom. Generally ratio of Plain Casing & Screen casing is 70: 30. But depends up on the hole drilled.
  3. Gravel Pack: Inserting 2-4mm natural gravel outside the casing and inside the open hole for artificial filtration.
  4. Development: one need to do development by air jetting until water comes out clean. Generally it is 3 hours but still depends up on the hole.
  5. Well head Slab: on the top 1mtr x 1 meter x 1 meter(LBH) digging pit & then making slab by using Cement, Send and gravel in proper ration which will prevent the hole by contamination. Sometime client like to have a manhole which will be under ground with metal cover, so that place will look like flat.
  6. Capping: fitting cap on the top until installation of pump etc.
  7. Test Pumping: For the measuring exact yield of the borehole one has to do test pumping i.e. pump out water continuously 24 hours, then one can know the yield of the well and the rest level & pumping water level etc. This is most important process to decide the size of pump.
  8. Water Chemical & Bacteriological analysis: Done  by government chemist to know the water is suitable for the domestic / industrial use or not.
  9. Completion Report: preparing completion report (Form 009 A) as per WRMA rules & submit to the WRMA office as well as to the client.
  10. Obtaining Borehole number from the Ministry.

Quick Links

23 تموز/يوليو 2019
30 تشرين2/نوفمبر -0001
01 كانون2/يناير 2011
02 شباط/فبراير 2015

 

Supply Chain optimization through prudent use of human resource,Time & Technology ... Read more

Working Time

Mon 08:00 AM - 05:00 PM
Tue  08:00 AM - 05:00 PM
Wed 08:00 AM - 05:00 PM
Thur 08:00 AM - 05:00 PM 
Fri 08:00 AM - 05:00 PM
Sun 08.00 AM -  01.00 PM

Saturdays & Public Holidays - CLOSED 

Twitter Feeds

Please publish modules in offcanvas position.